Skip to content

Sector

Manufacturing

From purchase order to dispatch, with the cost of the job known before it ships rather than after.

What goes wrong

A manufacturer's problem is rarely production. It is that the quotation was priced on last quarter's material cost, the shop floor reports progress by telephone, and wastage is noticed at stock-take rather than against the job that caused it. By the time anyone can say whether an order made money, the next three have already been quoted the same way.

Made-to-order work makes this sharper. Nothing is produced for stock, so every order is a fresh calculation, and the margin sits entirely in how accurately that calculation was made.

What we bring

  1. 01Cost sheets built from the real landed cost of material, including freight and duty
  2. 02Production job cards with stage-wise updates from a phone on the floor
  3. 03Wastage recorded against the order that caused it, not the month
  4. 04Quality control with a certificate per batch
  5. 05Moulds and tooling tracked as assets with their own history
  6. 06Order-wise profitability, available while the order is still open

Where it runs

NestOps, configured for made-to-order manufacturing — custom packaging produced in a customer's own brand for dairy, beverage and FMCG companies.

Regional note

Manufacturers supplying into the Gulf carry two tax regimes at once: Indian GST on the domestic side, and 5% VAT in Oman and the UAE on the export side, with e-invoicing obligations arriving in both. One system that handles both is cheaper than two that have to be reconciled.

Working across the Gulf

Talk to us about manufacturing