Skip to content

Datova product · Flagship platform

Datova ERP

The platform for businesses that manufacture to order and ship abroad — coir, aluminium fabrication, export-distribution. Purchase to production to export documents to the ledger, in one system, with one set of figures.

Built for
Manufacturing & export
Costing
Per work order
Tax
GST · Gulf VAT
Currency
Multi-currency

The whole thing on one line

An order arrives. This is everything that follows.

Seven steps. Each one writes to the same ledger, so the cost of a job is known while the job is still open — not three weeks after it shipped.

Applied AI layer — ask in plain language, answers cite the recordOrderEXPORT / DOMESTICPlanningBOM · ROUTINGPurchasePO · LANDED COSTProduction6 STAGESQualityHOLD · RELEASEDispatchPACK · CONTAINERExport docsINVOICE · COO · BLOne ledger — every step above posts here, as it happensPLANNED COST IS SET AT PLANNING · ACTUAL COST ACCUMULATES THROUGH PRODUCTION · THE GAP IS VISIBLE ON DAY THREE
  • One number, not twoPlanned cost and actual cost sit on the same work order. The gap is visible on day three, not at month end.
  • Export paperwork is generatedInvoice, packing list, certificate of origin — built from the shipment, not retyped from it.
  • Stock is realIssued to a job means gone from stores. No parallel register anybody maintains by hand.

What a managing director opens first

The operations summary.

One screen, four numbers, and the one list that matters — what is late and why. Everything else is a click away.

On-time dispatch
94%▲ 6 pts vs last quarter
Open work orders
234 due this week
Work in progress
₹18.4LAcross 6 stages
Yield
97.2%▼ 0.4 pts — curing

Illustrative product screens. Figures are samples, not a client's.

Production · stage boardLive
  1. Fibre prep

    3 JOBS
    • WO-2611-087Geotextile 2m × 50m400 ROLLS · DUE 02 DEC
    • WO-2611-091Coir pith block1,200 KG · DUE 05 DEC

    +1 more

  2. Spinning

    4 JOBS
    • WO-2611-082Yarn 2-ply900 KG · DUE 29 NOV
    • WO-2611-085Yarn 3-ply600 KG · DUE 01 DEC

    +2 more

  3. Weaving

    5 JOBS
    • WO-2611-078Anti-slip matting300 SQM · DUE 27 NOV
    • WO-2611-080Bristle mat 18mm450 SQM · DUE 30 NOV

    +3 more

  4. Latex coating

    2 JOBS
    • WO-2611-071Rubber-backed mat220 SQM · DUE 26 NOV (In progress, watch)

    +1 more

  5. Curing & QC

    3 JOBS
    • WO-2611-066Rubber-backed matHELD · MOISTURE 14% (On hold)
    • WO-2611-069Geotextile 1m × 50mPASSED · 24 NOV (Done)

    +1 more

  6. Packing

    6 JOBS
    • WO-2611-058Geotextile · 40ft FCLSEALED · BL PENDING (Done)
    • WO-2611-061Bristle mat · LCLREADY TO LOAD (Done)

    +4 more

What is inside

Twelve modules, one database.

  • Sales & CRM

    Enquiry, quotation, order, dispatch schedule. Export and domestic on the same pipeline.

  • Purchase

    Indent to PO to GRN, with landed cost — freight, duty and clearing loaded onto the item.

  • Inventory

    Multi-store, batch and lot, reorder levels, physical count with variance posting.

  • Production

    BOM, routing, work orders, stage-wise progress, material issue and return.

  • Quality

    Inspection plans at goods receipt, in-process and pre-dispatch. Hold and release.

  • Costing

    Standard and actual per work order. Variance by material, labour and overhead.

  • Export

    Shipment file, document set and HS codes, built from the order and the shipment.

  • Accounts

    Double-entry general ledger, AR and AP ageing, bank reconciliation, cost centres.

  • Tax

    Indian GST and Gulf VAT invoicing through tax templates. Tax is configuration, not code.

  • Fixed assets

    Asset register, depreciation schedules, transfers and disposals posted to the ledger.

  • HR & payroll

    Attendance, shifts, piece-rate and monthly payroll; labour cost flows to work orders.

  • Reports

    Standard set plus a query builder, and the AI layer for questions nobody wrote a report for.

It is our product, and it is configured for your plant.

Datova ERP ships with industry configurations — coir, aluminium fabrication, rubber, food processing, export-distribution — which set the BOM structure, routing stages, quality plans and document set for that trade. Beyond that we customise: your stage names, your approval chain, your report formats, integrations with the machines and portals you already use. The configuration is ours to maintain, so an upgrade does not undo your changes.

See Datova ERP on your own process.

Tell us what you make and how it ships, and we will walk you through it on that example.